Coral Chemical

Waste Treatment

Project Size: 2,000 SF
Year Built: 2022 to 2023
Cost: (Undisclosed)

Specialized Expertise:

  • Industrial Treatment
  • Hazardous Material
  • Construction While Operational
  • Overview

    John Martin Companies is assisting with the design-build services for wastre treatment process area for Coral Chemical. The project will be the central and consolidated waste treatment for the entire facility. This project was completed while the facility was fully operational.